Skip to content
Wooden phinisi hull framed on a Labuan Bajo slipway, scaffolding up and shipwrights at work

Boatyard — Labuan Bajo, Flores

Labuan Bajo Boat Builders: custom phinisi & day boats, framed on Flores slipways

A working yard at the gateway to Komodo National Park. Hardwood phinisi from 20 to 45+ metres and fast day boats for the park trade — designed, framed and fitted out in Labuan Bajo, ten to eighteen months from keel to launch.

  • 10–18 month builds
  • USD 0.6M–8M bands
  • Flores teak & ironwood
months, keel to launch
10–18
phinisi hull classes
20–45m+
new-build budget bands
USD 0.6–8M
cabin charter layouts
4–10

What the Yard Builds

Four hull classes, one slipway discipline

Every programme is scoped around the vessel’s working life in Komodo waters — from fast day loops out of Labuan Bajo harbour to multi-week expedition charters.

Day-Trip Trade

Komodo Day-Boat Class

Fast, compact hulls built for Padar–Komodo–Pink Beach loops, snorkelling decks and dive-day work.

Mission
Day charter & dive
Hull type
Fast compact
Budget
Quoted per hull
Commercial & charter builds
Entry Liveaboard

Liveaboard Phinisi 20–30m

The working core of the Komodo liveaboard fleet — dive decks, guest cabins and park-friendly anchoring.

LOA class
20–30 m
Timeline
10–18 months
New build
USD 600K–1.2M
Liveaboard builders
Flagship Charter

Luxury Phinisi 30–40m

Full-beam suites and 4–10 cabin layouts — the class that leads multi-day charter in the national park.

LOA class
30–40 m
Timeline
10–18 months
Band
USD 1.8–3M
Custom phinisi construction
Expedition

Superyacht Class 45m+

Explorer and expedition programmes engineered for longer range and heavier displacement.

LOA class
45 m+
Timeline
Scoped per programme
Band
USD 4–8M
Expedition builders
Shipwright shaping a hardwood baulk by hand in the Labuan Bajo yard, sawn timber stacked behind
Flores hardwood, worked by hand

Timber & Craft

Manggarai hands, Bugis lines

Flores boatbuilding joins two traditions: Bugis-Makassar hull geometry and the Manggarai carpentry of the island itself. The yard draws both into every keel it lays.

  • Local hardwood supply — sustainably sourced Flores teak and ironwood, bought closer to the forest than Bali yards manage, at sharper timber cost.

  • Generational shipwrights — framing, planking and caulking skills passed through working families, not classrooms.

  • Lean yard economics — lower operating costs on Flores flow straight into the build price and the 10–18 month schedule.

Keel to Launch

How a Labuan Bajo build runs

Five stages, one accountable yard desk — each milestone signed off before the next begins.

  1. 01

    Brief & naval design

    Hull class, cabin count, charter mission and budget band settled into drawings and a build contract.

  2. 02

    Timber & keel laying

    Teak and ironwood selected, seasoned and cut; the keel goes down on the slipway.

  3. 03

    Framing & planking

    Ribs raised and planking closed by Flores shipwrights — the silhouette owners fly in to see.

  4. 04

    Systems & fit-out

    Engines, electrics, rig and interior joinery installed beside the fleet the boat will join.

  5. 05

    Trials & handover

    Sea trials in Komodo waters, documentation completed, crew familiarised, keys handed over.

Built at the gateway to the park: finished hulls enter Komodo charter service without a delivery leg.

Reference Programmes

Budget bands the yard desk quotes against

Current programme bands in US dollars. A final quotation follows the design brief — and a survey, where an existing hull is involved.

Programme LOA class Charter role Timeline Budget band (USD)
Day boat & tender Compact, fast Padar–Komodo day loops, snorkel & dive days Per programme Quoted per hull & fit-out
Liveaboard phinisi 20–30 m Dive & multi-day charter 10–18 months 600K–1.2M
Luxury phinisi 30–40 m 4–10 cabin flagship charter 10–18 months 1.8M–3M
Superyacht class 45 m+ Expedition & explorer Scoped per programme 4M–8M
Used-hull refit 20–30 m Acquisition, survey & refit Scoped after survey 350K–800K acquisition

Bands reflect current yard programmes and market rates for Labuan Bajo–built vessels; used-hull figures are acquisition prices before refit scope.

The Yard

Build where the boat will work

Shipwright finishing a phinisi hull on the Labuan Bajo waterfront hardstand
Slipway & Launch

Labuan Bajo waterfront

Framing, planking and launch happen minutes from the harbour your vessel will call home — so owner visits land on real milestones, not photographs.

Shipyard services
A finished phinisi under way in Komodo National Park after launch
After Launch

Yard-to-fleet pipeline

Hulls finished here step straight into Komodo service, with refit, renovation and warranty support from the same slipway that built them.

Refit & renovation

2027 Slots

Hold a slipway slot for a 2027 launch

Send your brief — hull class, cabin count and budget band — and the yard desk will map a keel-to-launch schedule against open slipway capacity.