The process

How a Build Runs, First Enquiry to Handover

Five stages, each closed out before the next opens, over ten to eighteen months.

Start Your Project
Stages, each signed off
5
Typical programme
10-18mo
Design and architecture
2-4mo
Trials and delivery
1mo

Stage by stage

The Five Stages

Nothing moves to the next stage until the current one is agreed in writing. That is what keeps a wooden build to schedule.

  1. 01

    Consultation and Design

    We work with you on specification: length, purpose, interior layout, deck configuration and equipment.

  2. 02

    Naval Architecture

    Lines plan, structural calculation and 3D design, signed off before any timber is cut.

  3. 03

    Hull Construction

    Ironwood keel laid, frames fitted, planking closed by hand. The longest stage by some margin.

  4. 04

    Interior and Systems

    Cabins, saloon, galley and heads, with electrical, plumbing and navigation routed behind them.

  5. 05

    Sea Trials and Delivery

    Engine trials, stability checks and handover. Delivery can be arranged across Indonesia.

Construction typically spans 10 to 18 months, varying with the vessel size and the level of customisation requested.

A liveaboard at anchor under a rising sun

What You Get at Each Stage

Written cost breakdowns and a build schedule, so progress can be tracked against both rather than taken on trust.

Materials sourced locally: ironwood and teak from eastern Indonesia, from suppliers we can point you at.

Construction costs here are lower than Bali or Jakarta, largely because the timber and the craftsmen are already in Flores rather than shipped to it.

A Delivered Vessel, 2024

Length overall

Specification
38 metres
Why it matters
Sets cabin count and material volume

Beam

Specification
8 metres
Why it matters
Stability and deck space

Engine

Specification
450 hp
Why it matters
Passage speed and fuel burn

Fuel capacity

Specification
7 tonnes
Why it matters
Range between refuelling

Fresh water

Specification
16 tonnes
Why it matters
Days at sea before returning to port

One vessel we delivered in 2024, listed to show what a programme of this length produces.

After Handover

The relationship does not end at sea trials.

  • Maintenance

    Routine and preventative work, scheduled around your season.

  • Repairs

    Whatever the vessel needs, handled by the yard that built her.

  • Upgrades

    Systems and interior brought up to date as she ages.

Frequently Asked Questions

Start the First Stage

Stage one is a conversation about specification. Send length, purpose and timeline.