From the yard
What we learn on the slipway and on the water: build costs, permits, timber, and how a charter season actually runs.
61 articles
Market Outlook
Flores yards operate two warranty systems at once: the traditional one, where a builder’s name travels with every hull and…
Boat Construction
Komodo’s day-trip trade runs on four hull classes, and Labuan Bajo yards deliver all of them: open outboard speedboats of…
Boat Construction
Four well-timed visits do more for build quality than forty phone calls: keel-laying to set the relationship and witness the…
Yard Operations
Low-impact boatbuilding in Flores rests on five practices: fully documented legal timber, captured and removed hazardous waste, low-VOC coating systems…
Boat Construction
A realistic Labuan Bajo timeline for a 30–40 metre timber vessel runs 18 to 30 months from keel-laying to handover: two…
Yard Operations
Almost everything inside a Labuan Bajo build arrives by sea. Hardwood rides timber barges from Kalimantan via Surabaya or Makassar;…
Boat Construction
Flores has two working seasons, and every honest build schedule is written around them. The dry months from April to…
Flores Craft & Culture
Labuan Bajo’s boatbuilding culture is a marriage of two lineages: the hull-shaping tradition carried east by Bugis and Konjo migrants…
Yard Operations
Every yard in Labuan Bajo operates in the shadow of a UNESCO-listed national park, and that changes how boats get…
Yard Operations
Labuan Bajo’s building capacity is not one shipyard but a string of yard sites along roughly twenty kilometres of coast:…
Send us the vessel you have in mind, the itinerary and the guest count. We will come back with a bracket and a programme.